web
You’re offline. This is a read only version of the page.
close
Skip to main content

  • Knowledge Base
  • English
    • Español
    • Italiano
    • English
    • Français
    • Deutsch
    • Nederlands
  • Sign in

Electrical installation

  • Phase rotation in Alfen charging stations

    Phase rotation in Alfen charging stations

  • What should I check before the installation of an Alfen charging station?

    Provide a brief description of the topic here.

  • How can I check whether the meter box on site is suitable for installation of a specific charging station?

    This step-by-step guide will help you with [insert topic here]

  • When to apply a ground pin when installing an Alfen charging station

    In what situations is a ground pin needed?

  • Installing a charging station on an IT network or net without a "neutral".

    This page explains how to install a charger on a IT network, or a net without a neutral.

  • On what grid frequencies does a charging station operate?

    On what grid frequencies does a charging station operate?

  • On which power grids do Alfen's charging stations operate?

    Provide a brief description of the topic here.

  • Can I connect a 3-phase charging station to a 1-phase installation?

    This article provides more information on installing a 3-phase charger to a 1-phase installation.

  • What thickness should the power cable have if it is over 50 meters long?

    This article informs on the cable thickness when the installation cable is over 50 meters.

  • What is the maximum length of a cable between charge station and smart meter for Active Load Balancing with P1?

    The article provides information on P1 installation.

  • What is the maximum diameter of the power cables I can connect to a charging station?

    This article gives information on the maximum cable diameter that can be used on Alfen chargers.

  • How to diagnose error code 212 [Missing phase in installation]

    This guide will walk you through the process of diagnosing the cause of Error code 212 reported by the charger.

  • Connecting the Alfen Twin 5 to a Grid Without Neutral in Belgium

    How to connect Alfen Twin 5 to a Belgian grid without neutral—two setup options, wiring steps, and ACE configuration explained.

Links

Alfen.com

Alfen Training

Webshop EV Charging Equipment

© Alfen N.V. | Disclaimer | Privacy and Security

.