Views:

 

Background

Internal phase rotation is applied to allow the most optimal charging for 2 EV's charging on 1-phase at the same time.
As a result of the rotation on 1 of the sockets, both EV's can benefit from the maximum current the charger is configured for.
 

For chargers on the NG-Platform

Models:

  • Eve Double Pro-Line

  • Eve Double PG-Line

  • Twin4XL

In charging stations with 2 sockets, phase rotation is applied in the left socket (socket 1)
The 1st and 3rd phase are switched in the circuit.

Incoming phase on mainswitchConnects to socket
L1L3
L2L2
L3L1

 

When a single-phase vehicle is charging on the left socket (socket 1), the actual power of the 3rd phase in the installation is reduced. 
No phase rotation applies to the right socket (socket 2).

 

For chargers on the AHP-Platform

Models:

  • Eve Double Plus

  • Twin5

  • Twin5 Plus

In charging stations with 2 sockets, phase rotation is applied in the right socket (socket 2)
 

Incoming phase on mainswitchConnects to socket
L1L3
L2L1
L3L2
No phase rotation applies to the left socket (socket 1).
When a single-phase vehicle is charging on the right socket (socket 2), the actual power of the 2nd phase in the installation is reduced. 
 

 

When phases of the power supply cable are twisted in relation to the installation, this also affects this.